Case Study

York Central

In conjunction with York City Council and John Sisk and Sons

Sector

Regeneration

Completion

July 2025

Project Value

£3,900,000

Location

York

Project Overview

14,000m² of precision paving at the heart of York’s most significant regeneration site

The York Central development is a major regeneration project, creating a high-quality, accessible pedestrian route through one of the city’s most significant sites. The works enhance connectivity while providing a durable and visually appealing public realm.

Killingley was appointed on behalf of John Sisk to deliver concrete bases, kerbing, paving and grouting, laying approximately 14,000m² of paving to form a robust pedestrian corridor through the development.

The precision paving, kerbs and grouting ensure long-term durability and ease of maintenance, supporting safe pedestrian movement. Killingley’s works contribute to a functional, high-quality public space that complements the broader York Central regeneration and enhances the city’s urban environment.

Project Highlights

  • Approximately 14,000m² of paving installed
  • Concrete bases, kerbing and grouting to precision tolerances
  • Durable, low-maintenance public realm for long-term performance
  • Delivered on behalf of John Sisk within a live regeneration site
  • Landscape design by Sweco Landscape Architects

The Challenge

Deliver a large-scale, high-quality paved pedestrian corridor across a live regeneration site, meeting tight tolerances while working within John Sisk’s principal contract programme.

Our Solution

A coordinated package of concrete base construction, kerbing, paving and grouting across approximately 14,000m², sequenced to integrate with the wider York Central development programme.

The Result

A durable, high-quality pedestrian corridor that supports safe movement, complements York Central’s broader vision and contributes to a lasting public realm at the heart of the city.

Project Team

Main Contractor: John Sisk and Sons

Client: York City Council

Landscape Architects: Sweco

Scope of Works

What we delivered

Hard Landscaping

Approximately 14,000m² of paving laid to form a robust, high-quality pedestrian corridor through the York Central development.

Pedestrian Access

Kerbing installed to define and protect the pedestrian corridor, ensuring safe, clearly delineated movement through the site.

Programme Delivery

Concrete base construction, paving and grouting sequenced and delivered within John Sisk’s principal contract programme on a live development site.